ABB HT842305 Operation Manual page 10

Table of Contents

Advertisement

Operation Manual / TPL85-B14/-B15/-B16
1 Preliminary remarks / 1.4 Storage of new turbochargers and spare
parts
© Copyright 2018 . All rights reserved.
permissible humidity has been exceeded. In this case the turbochar-
ger or rotor must be inspected by an ABB Turbocharging Service Sta-
tion and repacked.
Inspect the package for damage. If the package is damaged, the tur-
u
bocharger or cartridge group must be inspected by an ABB Tur-
bocharging Service Station and repacked.
After every 3 years the following work steps must be performed by an
ABB Turbocharging Service Station:
¡
Inspect the components
¡
Exchange the desiccant agent
¡
Repackage the components.
NOTICE
Replacement components ready for operation
If the 70% display field of the hygrometer (02) has not changed colour
and the package is undamaged, the replacement turbocharger or re-
placement cartridge group can be placed into operation without any
prior testing by an ABB Turbocharging Service Station.
Unpacking replacement turbochargers or spare parts
The corrosion protection effect ends after the material is unpacked from
the VCI package.
To avoid the formation of condensation, the surroundings and the con-
tent of the package must have the same temperature during unpacking.
HZTL2491_EN
Revision C
August 2018

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl85-b14

Table of Contents