SUPERSTORAGESYSTEM SSG-2028R-DN2R24L User's Manual

Installing into the Rack

After the rails are installed on the chassis and on the rack, the server can be installed
in the rack. It is heavy and requires two to three people to lift.
Installing the Chassis into a Rack
1. Pull both middle rails out the front of the outer rail until each clicks to a stop.
2. Align the inner rails on the chassis with the front of the middle rails.
3. Slide the inner rails on the chassis into the middle rails, keeping the pressure
even on both sides. When partially in, the locking levers will stop further
progress.
4. Press down the locking levers on the inside of the inner rails and push the
chassis all the way into the rear of the rack. The front latches will click into
place.
Figure 2-5. Installing the Chassis into the Rack
1
Note: Figures are for illustrative purposes only. Your actual chassis may differ.
Always install servers into racks from the bottom up.
The server is now mounted in the rack. It can be pulled partially out for service by
lifting both front latches.
3
2-8

Removing the Chassis From the Rack

Caution: The server is heavy and requires two to three people to lift it out.
Removing the Chassis
1. Lift the right and left front latches which are just below the LED control panels
on the front edges of the chassis.
2. Pull the chassis forward until it clicks to a stop.
3. Press down the locking lever on the inside of the inner rail (Figure 2-2) to
release the server. Continue to pull the server out of the middle rails.
Figure 2-6. Removing the Chassis
1
2
2-9
Chapter 2: Server Installation