Zepro ZN 2500-130 Installation Instruction page 42

Tail lift
Table of Contents

Advertisement

Cable routing
5.4.1
Main power switch
1. Mount the main switch on a bracket next to controller CD 19 or in any well-protected place with universal
bracket, see Image 69 and Image 70.
!
IMPORTANT
The main switch drainage should always be directed downwards.
2. Connect the main switch cable to the main tail lift current cable quick connector.
3. Connect the main power cable to the second quick connector on the main switch cabling.
4. When installing the main switch and CD 19 controller on the arm attached to the tail lift, route the main
switch and controller cables on the underside of the arm and fasten with cable ties.
5. Pull the main power cable from the main switch to the fuse box/battery plus pole. Prepare the cable with a
cable terminal and shrink hose without connecting. Connection is described later in section
6. Route the controller cabling onwards to the tail lift cable grommet where appropriate. In some cases, the
controller cabling may already be connected at the factory. If not, it can be connected later in section
!
IMPORTANT
The positive cable to the battery and main fuse is connected later in Section 7, after the cable has been routed/installed.
Image 69. Installation of main
switch to CD 19 controller
42
Drainage
Image 71. Main power switch
Image 70. Installation of main
switch on universal bracket
ZN 2500-130/150
7.
6.
www.zepro.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zn 2500-150

Table of Contents