Fig.11: Shelf Support/Sheet Insert Installation - VWR symphony 5.3 A Operating Instructions Manual

Co2 incubator
Table of Contents

Advertisement

Operating Instructions | symphony 5.3 A – 06/2009
5
5
5
Start-up
Start-up
Start-up
Installing the shelf supports:
1. Fig.11: Insert the shelf supports [3] into the perfo-
rations [1] of the support rail with the bar facing
down.
2. Make sure that the two vertical elements [2] of the
shelf support are flush with the support rail.
Installing the shelves:
1. Push the shelf [4] onto the shelf supports with the
tilt protection [5] facing the rear panel of the
device. The tilt protection [5] is also used as a
guide for the shelf.
2. Slightly raise shelf so that the withdrawal stop [6]
can be routed over the shelf supports.
3. Make sure that the shelf supports are positioned
in the two tilt protectors in a way that it can move
freely.
Levelling the device:
1. Position a bubble level on the center shelf.
2. Rotate the adjustable device stands using the sup-
plied 24 mm wrench until the shelf is positioned
horizontally in all directions. Perform the adjust-
ment of the device stands from left to right and
from rear to front.

Fig.11: Shelf support/sheet insert installation

27
AInstalling the shelf supports:

Advertisement

Table of Contents
loading

Table of Contents