Chapter 5 Start-Up; Preparing The Work Space; Installing The Shelf System - VWR CO2 Incubator Basic User Manual

Table of Contents

Advertisement

VWR
Start-up

Preparing the work space

The incubator is not delivered in a sterile state. Before the initial start-up, the device must be
decontaminated.
Before the decontamination is performed, the following work space components must be cleaned:
Support rails
Support hooks
Shelves
Work space surfaces
Work space seals
Glass door
NOTE!
Decontamination:
For details about the cleaning and disinfection of the device, see Chapter 9 "Cleaning and disinfection".

Installing the shelf system

Tools are not required for the installation of the shelf system. The support rails are secured using
spring pressure. After the support hooks have been inserted into the rail, the shelves are pushed
onto the support hooks.
CO2 Incubator Basic | 29

Advertisement

Table of Contents
loading

Table of Contents