DVS/GSE
Table 6. Relay System Test Points and Expected Values
System
First
Component
Test
Point or
Pin
Number
TB1
1
TB1
3
K2
A1(13)
K2
41(12)
K2
41(12)
K2
11(9)
K2
11(9)
K3
A1(13)
K3
41(12)
K3
41(12)
K3
11(9)
K3
11(9)
09030-78B
Second
Expected
Test
Value,
Point or
System
Pin
Off
Number
2
Open
4
Open
A2(14)
0VAC
42(4)
Closed
44(8)
Open
12(1)
Closed
14(5)
Open
A2(14)
0VAC
42(4)
Closed
44(8)
Open
12(1)
Closed
14(5)
Open
45
of
DVS
GSE
Expected
Comments/ Actions
Value,
System On
100-
If test fails, troubleshoot
135VAC
PowerStation Cabinet per section
while
3.1
booting/
Short when
enabled
100-
If test fails, troubleshoot
135VAC
PowerStation Cabinet per section
while
3.1
booting/
Short when
enabled
115-
If test fails, check T2 per section
125VAC
3.4.8 and troubleshoot thermal
system per section 3.4.8
Open
If test fails, and K2, A1-A2 shows
proper voltage, replace relay
assembly
Closed
If test fails, and K2, A1-A2 shows
proper voltage, replace relay
assembly
Open
If test fails, and K2, A1-A2 shows
proper voltage, replace relay
assembly
Closed
If test fails, and K2, A1-A2 shows
proper voltage, replace relay
assembly
115-
If test fails, check T2 per section
125VAC
3.4.8 and troubleshoot thermal
system per section 3.4.8
Open
If test fails, and K3, A1-A2 shows
proper voltage, replace relay
assembly
Closed
If test fails, and K3, A1-A2 shows
proper voltage, replace relay
assembly
Open
If test fails, and K3, A1-A2 shows
proper voltage, replace relay
assembly
Closed
If test fails, and K3, A1-A2 shows
proper voltage, replace relay
assembly
Webasto Charging Systems, Inc.
49