Chapter 4: Routine Maintenance Procedures; Assembling And Disassembling Skylife - NeoLight Skylife Service Manual

Infant phototherapy system
Hide thumbs Also See for Skylife:
Table of Contents

Advertisement

Chapter 4: Routine Maintenance Procedures

This chapter includes procedures for routine maintenance of the Skylife system. These procedures may be
performed after any of the following events and/or as prescribed by the institution's maintenance
schedule:
Initial receipt of the Skylife at the institution.
Skylife has been visually damaged or subjected to mechanical shock (e.g., dropped).
Skylife has been submitted for maintenance or scheduled performance verification.
IMPORTANT!
Routine maintenance should be performed according to each section's requirements.
Cleaning and disinfection should occur between patients or if the Skylife Disposable
Swaddles are soiled or damaged.
IMPORTANT!
The routine maintenance must be performed at the time of replacing the GelMat every
6 months, 1,500 hours of use, or if damaged, whichever comes first
NOTE:
Please record the Light Module hours of use in our Service Guide in Appendices A & B,
when the GelMat is replaced. Also, please follow the instructions for each section
closely to prevent damage or harm.
4.1 Unpacking and Packing Skylife
1. Skylife is shipped in the
following shown packaging
schema. Please save all the
boxes after unpacking for
future shipment of Skylife
for possible service and
repair activity.
© 2022 by NeoLight LLC.
All rights reserved.
Page 18 of 43
500050 Rev A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents