Modulex EXT Commercial Series
CHAPTER 4: Installation Instructions
Figure 4-6: BMM Location and Flow Switch Connection
4.13 Determination Of Primary Boiler Pump or Boiler System Pump
∆t
The following table gives an indication of the pump's flow rate in function of the
of the primary
circuit if the installation has a mixing header.
The size of the pumps must be determined by installers or technical engineers according to boiler data
and system design.
OMM-0160_A • DRAFT
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Page 32 of 117