Installation Accessories; Pre-Installation Checklist - H3C SecPath F100-X-G3 Installation Manual

Table of Contents

Advertisement

Installation accessories

Table1-5 Installation accessories
Mounting bracket
for the F100-C-G3,
F100-S-G3, and
F100-M-G3
Grounding cable

Pre-installation checklist

Table1-6 Pre-installation checklist
Item
Installation
site
Mounting brackets
(including M4 shoulder
screw) for F100-A-G3,
F100-E-G3,
F1000-C-G3,
F1000-S-G3,
F1000-A-G3, and
F1000-E-G3
Releasable cable tie
(user supplied)
Requirements
Ventilation
Temperature
Relative humidity
Cleanness
ESD prevention
M4 mounting
bracket screw
Power cord retainer
clip
There is a minimum clearance of 100 mm (3.94 in)
around the inlet and outlet air vents for heat
dissipation of the firewall chassis.
A good ventilation system is available at the
installation site.
Operating:
Without drives: 0°C to 45°C (32°F to 113°F)
With drives: 5°C to 40°C (41°F to 104°F)
Storage: –40°C to +70°C (–40°F to +158°F)
Operating:
Without drives: 5% RH to 95% RH,
noncondensing
With drives: 10% RH to 90% RH, noncondensing
Storage: 5% RH to 95% RH, noncondensing
Dust concentration ≤ 3 × 10
No dust on desk within three days
The equipment, workbench, and rack are reliably
grounded.
The equipment room is dust-proof.
The humidity and temperature are at an acceptable
level.
Wear an ESD wrist strap and make sure it makes
good skin contact and is reliably grounded when
7
M6 rack screw and
cage nut (shipped
with the
F100-C-G3,
F100-S-G3, and
Rubber feet
F100-M-G3
firewalls and user
supplied for other
models)
Power cord
4
3
particles/m
Result

Advertisement

Table of Contents
loading

Table of Contents