Installation accessories

Table1-5 Installation accessories
M6 screw
Rubber feet

Pre-installation checklist

Table1-6 Checklist before installation
Item
Installation
site
Cage nut
Console cable
Requirements
Ventilation
Temperature
Relative humidity
Cleanness
ESD prevention
EMI prevention
Front mounting bracket
and M4 mounting screw
Grounding cable
Ensure a minimum clearance of 100 mm (3.94 in)
around the air inlet and outlet vents of the chassis.
If you install the firewall in a standard 19-inch rack,
ensure a distance of 1U (44.45 mm, or 1.75 in)
between the chassis and other devices.
A good ventilation system is available at the
installation site.
Operating: 0°C to 45°C (32°F to 113°F)
Storage: –40°C to +70°C (–40°F to +158°F)
Operating: 5% RH to 95% RH, noncondensing
Storage: 5% RH to 95% RH, noncondensing
Dust concentration ≤ 3 × 10
No dust on desk within three days
The equipment, workbench, and rack are reliably
grounded.
The equipment room is dust-proof.
The humidity and temperature are at an acceptable
level.
Wear an ESD wrist strap and make sure it makes
good skin contact and is reliably grounded when
installing removable components.
Put the removed interface modules away on an ESD
workbench, with the PCB upward, or put them in ESD
bags for future use.
Touch only the edges, instead of electronic
components when observing or moving a removed
interface module.
Take effective measures to protect the power system
from the power grid system.
6
Rear mounting bracket
and M4 shoulder screw
4
3
particles/m
Result