Download Print this page

Heartland GENTRY GABLE VALUE Series Assembly Manual page 65

Advertisement

• You will finish off the top of the roof with a ridge cap made from shingles.
BEGIN
1
Cut shingles into THREE pieces.
2"
(5,1 cm)
Weather Seal
Note: •You will need about 38 - 40 cut pieces for 12' x 12' model
2
Install first ridge cap flush to shingles at front, as shown.
3
Install second ridge cap 5" back, as shown.
SHINGLES - RIDGE CAP
Hint: Use cut-off pieces first.
2"
(5,1 cm)
2"
2"
(5,1 cm)
(5,1 cm)
Flush
5"
12,7 cm
FRONT OF
SHED
2"
(5,1 cm)
2"
(5,1 cm)
Top of slot.
(1) Nail per side through weather seal.
(1) Nail per side through weather seal.
Flush
63
Score shingle,
then snap-off angled cut.
30 to 32
Pieces

Advertisement

loading