Download Print this page

Heartland GENTRY GABLE VALUE Series Assembly Manual page 34

Advertisement

PARTS REQUIRED:
x2
Pre-assembled
BEGIN
1
Lift and set gable unit on wall doubler.
Measure 1-1/2" (3,8 cm) down from top plate doubler and mark at each side as shown.
Hold secure with (1) 1-1/2" nail on each side.
ENSURE GABLE IS CENTERED ON WALL BEFORE NAILING.
Continue nailing lower edge of panels into top plate doublers with 1-1/2" nails spaced 6" apart.
2
Secure panels to rafter with 1-1/2" nails spaced 6" apart.
NAIL FIRST
2-9/16"
1-1/2"
(6,5 cm )
(3,8 cm)
Measure and
Mark
3
Working inside, secure gable unit with (2) 3" screws toe-screwed into each AF at an angle (Fig. A).
Repeat steps to install gable unit on the opposite side.
FINISH
Your gable units are now installed.
GABLE UNIT INSTALLATION
6"
(15,2 cm)
DOUBLER
x8
x90
2" (5,1 cm)
Fig. A
32
3" (7,6 cm)
AF
3" (7,6 cm)
Screws
NAIL FIRST
1-1/2"
1-1/2"
(3,8 cm )
(3,8 cm)
Measure and
Mark

Advertisement

loading