Download Print this page

Heartland GENTRY GABLE VALUE Series Assembly Manual page 29

Advertisement

PARTS REQUIRED
x15
2" (5,1 cm)
x26
1-1/2" (3,8 cm)
BEGIN
1
Place front gable wall on fl oor,
centered between eave walls.
Secure wall with 2" screws into top and bottom plates
(Fig. A, Fig. B).
Secure wall to bottom plate fi rst.
ENSURE PANEL CORNERS ARE FLUSH.
2
Nail lower edge of panels to fl oor with 2"
nails spaced 6" apart.
Angle nail to hit fl oor frame (Fig. C).
Secure panels to both side wall studs
with 1-1/2" nails spaced 6" apart.
Secure wall bottom plates to fl oor with 3"
nails (Fig. C).
3
Secure top plates with 3" screws at
each corner at an angle as shown
(Fig. D).
REMOVE TEMPORARY BRACING
2" (5,1 cm)
FINISH
Your walls are now installed.
EAVE WALL INSTALLATION
x2
x9
3" (7,6 cm)
Nails
Nail 2" nails fi rst.
Nails
Fig. C
3" (7,6 cm)
3" (7,6 cm)
Fig. B
Flush
3" (7,6 cm)
Screw
Fig. D
27
x4
2" (5,1 cm)
2" (5,1 cm) Screw
Fig. A
3" (7,6 cm)
Nails
2" (5,1 cm)
Nails
6"
(15,2 cm)
Flush
2" (5,1 cm)
Screw
1-1/2"
(3,8 cm)
Nails
6" (15,2 cm)

Advertisement

loading