Download Print this page

Heartland GENTRY GABLE VALUE Series Assembly Manual page 33

Advertisement

PARTS REQUIRED:
x2
x2
BEGIN
1
Orient (2) AF on flat side as shown.
Place center gable panel on AF.
Secure with 1-1/2" nails.
2
Place left and right gable panels on AF flush to center panel.
Secure with 1-1/2" nails.
Mark the center of the middle panel.
Repeat steps to build the second gable panel unit.
GABLE UNITS
x4
AF
2 x 4 x 18-1/8" (5,1 x 10,2 x 46 cm)
x2
Install all gable panels with the primed side facing up.
3-1/2"
(8,9 cm)
AF
1-3/4"
(4,4 cm)
Flush
1-1/2" (3,8 cm) Nails
Flush
Mark
31
x12
1-1/2"
(3,8cm)
2-1/2"
(6,4 cm)
1-1/2" (3,8 cm) Nails

Advertisement

loading