Download Print this page

Heartland GENTRY GABLE VALUE Series Assembly Manual page 59

Advertisement

3
Line-up shutter slat fl ush with end corner of DT
as shown (Fig. B).
Use a level to ensure shutter is level.
Secure with 2" fi nishing nails at locations shown.
Nail into wall studs.
Don't nail into metal window frame.
4
From inside of the shed, secure shutter at
locations indicated with "X" using 3/4" screws.
Have a second person hold and press inward
from outside shed while screws are installed.
5
Install DT fl ush to bottom of shutters.
Align DT fl ush with shutter slats (Fig. C).
Secure with 2" fi nish nails.
Nail into wall frame and studs behind.
FINISH
Your window and shutters are now installed.
SHUTTERS
Flush
LEVEL
2" (5,1 cm)
Finishing Nails
3/4" (19 mm)
Screws
from inside
Flush
57
DT
Fig. B
Fig. C
DT
2" (5,1 cm)
Finishing Nails
Flush
Flush

Advertisement