iFIT WEIDER 2980 X User Manual page 15

Table of Contents

Advertisement

22. Attach the Low Cable (53) to the U-bracket (45)
with an M6 Washer (80) and an M6 Locknut (84).
See the inset drawing. Do not overtighten the
M6 Locknut (84); it should be threaded onto
the end of the Low Cable (53) so that only two
threads are showing above the Locknut.
23. See the CABLE DIAGRAM. Identify the High
Cable (55).
Route the High Cable (55) upward through the Top
Frame (4) and over a Pulley (48). Make sure that
the eyelet end (J) of the High Cable is in the
location shown.
Attach the Pulley (48) inside the Top Frame (4)
with an M10 x 68mm Bolt (71), two M10 Washers
(57), two 13mm Spacers (52), and an M10
Locknut (56).
24. Route the High Cable (55) over a Thin Pulley (47)
and downward through the Top Frame (4).
Attach the Thin Pulley (47) inside the Top
Frame (4) with an M10 x 68mm Bolt (71), an M10
Washer (57), and an 10mm Spacer (49). Make
sure that the Thin Pulley does not fall out of the
Top Frame while you complete steps 25 and 26.
Note: Another Thin Pulley (not shown) will be
installed inside the Top Frame (4) with the same
M10 x 68mm Bolt (71) in step 26.
25. Wrap the High Cable (55) under a Pulley (48).
Attach the Pulley (48), a Cable Trap (50), and
two Half Guards (43) to the upper hole in the
U-bracket (45) with an M10 x 50mm Bolt (66) and
an M10 Locknut (56).
Make sure that the Cable Trap (50) is oriented
to hold the High Cable (55) in the groove of the
Pulley (48) and that the Half Guards (43) are on
the outside of the U-bracket (45).
22
84
80
84
45
53
23
57
52
56
J
24
55
25
15
45
53
55
4
48
52
57
71
47
4
49
57
55
43
48
56
50
43
66
45
71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wesy19318.2

Table of Contents