19. Route the Low Cable (53) under a Pulley (48) and
through the Upright (3).
Attach the Pulley (48) inside the Upright (3) with an
M10 x 68mm Bolt (71), two M10 Washers (57), two
13mm Spacers (52), and an M10 Locknut (56).
20. Route the Low Cable (53) over a Pulley (48).
Attach the Pulley (48) and two Half Guards (43)
to the Double U-bracket (63) with an M10 x 45mm
Bolt (81) and an M10 Locknut (56). Make sure
that the Half Guards are on the outside of the
U-bracket as shown.
21. Route the Low Cable (53) under a Pulley (48).
Attach the Pulley (48) and two Half Guards (43)
to the Base (1) with an M10 x 45mm Bolt (81) and
an M10 Locknut (56). Make sure that the Half
Guards are on the outside of the bracket as
shown.
19
57
52
56
48
53
20
43
21
43
56
14
3
52
56
63
81
53
48
53
48
1
57
71
43
81