Startup And Test; Save User Settings - Toshiba HX7+ ASD Installation & Operation Manual

Hide thumbs Also See for HX7+ ASD:
Table of Contents

Advertisement

Startup and Test

Perform the following checks before turning on the unit:
• L1/R, L2/S, and L3/T are connected to the 3-phase input power.
• T1/U, T2/V, and T3/W are connected to the motor.
• The 3-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secured.
• Front door is closed and all enclosure panels are securely fastened.
• All personnel are clear of the area of the installation and the driven equipment.

Save User Settings

Use the following table to record any changed parameters for future reference.
Table 11. ASD Parameter Changes by Installer/Maintenance Personnel.
ASD ID__________Name:______________________Date:_______
Parameter
Parameter Name
Number
Note: Settings may also be recorded via Program  Utility Parameters  Type Reset 
Parameters.
HX7+ ASD Installation and Operation Manual
Default or
Previous
New Setting
Setting
Notes
Unit of
Measure
Save User
37

Advertisement

Table of Contents
loading

Table of Contents