Startup And Test - Toshiba Q9 True Torque Control2 Adjustable Speed Drive Quick Start Manual

Table of Contents

Advertisement

Startup and Test

Before turning on the ASD ensure that:
• The enclosure door is closed or reattached, and secure.
• R/L1, S/L2, and T/L3 are connected to the 3-phase input power.
• U/T1, V/T2, and W/T3 are connected to the motor.
• The 3-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secure.
• All personnel are at a safe distance away from the motor and/or the motor-driven equipment.
Q9 ASD Quick Start Guide
23
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com

Advertisement

Table of Contents
loading

Table of Contents