Replacing Hand Rail Heater; (Solid Fronts) - Hussmann Excel FWG Installation & Operation Manual

Low temperature, single deck wall & island merchandisers
Table of Contents

Advertisement

P/N 0467434_P

REPLACING HAND RAIL HEATER

(SOLID FRONTS)

To replace the heater:
G rounding Wire
1. Turn OFF the power to the merchandiser.
Harnes s
2. Remove return grilles, package guard
C orner Cap
and interior panel as needed from the
B racket
compartment being serviced.
3. Remove screw and corner cap.
4. Remove screws, grounding wire harness
and corner cap bracket.
R emove Screw
R emove
C orner Cap
G rounding Wire
Harnes s
G rounding Wire
Harnes s
C orner Cap
B racket
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
S crew
R emove Screw
Hand Rail
5. Remove hand rails, hand rail retainers and
(Rear)
heater from hand rail retainers.
6. Remove wireway cover.
(Rear)
(Rear)
S crew
To avoid serious injury or death from electrical
shock, always disconnect the electrical power
at the main disconnect when servicing or
replacing any electrical component. This
includes, but is not limited to, such items as
doors, lights, fans, heaters, and thermostats.
— LOCK OUT / TAG OUT —
Low Temperature
6-3
Excel

Advertisement

Table of Contents
loading

Table of Contents