Start-up sequence

7.2.1

To start the UPS:

1.
Attach the load device(s) to the UPS or to the electrical distribution board, but do not
turn the load devices ON until you have set the UPS output voltage, as described
below.
2.
Turn on the circuit breakers for the ac input, the bypass input, and the battery. The UPS
performs a self test; this takes about a minute. Afterwards, you should see the following
screen.
7.2.2

Verify proper number of input and output phases

Before turning the UPS on for the first time, verify that the UPS's setting for number of input and
output phases is correct for your requirements. The phase setting can be seen on the second
page of the Profile screen, shown here with the phase setting highlighted.
See on page 17 for instructions on how to display the Profile screen.
38
Gamatronic Electronic Industries Ltd.

Figure 37: Verify proper line configuration

User Guide: MEGA V2 SA25, Release 1.5