- 1 ½" X 3 ½" X 45 ½" - Floor Runners - Short; - 5/8" X 45 3/8" X 70 5/8" - Plywood Floor - OLT SpaceSaver SS124-SLIDER-CEDAR-FJ Assembly Manual

12x4 sliding doors - cedar roof - fj siding
Table of Contents

Advertisement

3.
Position 1C - Floor Runners - Short on each
side of the completed floor frame. Runners should
be flush with corners but not overhanging. Attach
with 4 - 2 1/2" Screws per Runner.
Floor Runners flush with Floor Frame on back.
Long Floor Runners overhanging Floor Frame on front.
4.
Align 1CC - Floor Runners - Long evenly spaced as shown above and
flush with the back of the Floor Frame. On the front, Runners will extend 2"
past the Floor Frame to provide support for the Sliding Door Track later in
the Assembly. Attach with 4 - 2 1/2" Screws per Runner.
With Floor Runners attached, carefully flip the floor over and place on your
foundation. Caution - Be careful when laying floor down not to bend or twist
floor. Note: Having a level foundation is critical. Choosing a foundation will
vary between regions. Typical foundations can be concrete pads or patio
stones positioned underneath the floor runners.
5.
Position 1D - Plywood Floor on top of completed floor frames.
Plywood will sit slightly inset from outside of floor frame.
Toll Free 1-888-658-1658
1C - Floor Runners - Short
(1 1/2" x 3 1/2" x 45 1/2") x 2
www.outdoorlivingtoday.com
Page 8
Parts
S1 - 2 1/2" Screws
Concrete Slab
Foundation
1CC - Floor Runners - Long
(1 1/2" x 3 1/2" x 47 1/2") x 5
S1 - 2 1/2" Screws
Note: Plywood is cut slightly
smaller than floor framing.
Keep plywood seams tight.
1D - Plywood Floor
(5/8" x 45 3/8" x 70 5/8") x 2
sales@outdoorlivingtoday.com
Hardware
x 8 total
Front
Parts
Hardware
x 20 total
Parts

Advertisement

Table of Contents
loading

Table of Contents