Download Print this page

Floor Section - OLT CB128-SLIDER-PLY-AK Assembly Manual

12x8 cabana-slider-ak (t&g) plywood roof

Advertisement

A. Floor Section
Plywood Floor
Small (3)
Floor Joist
Frames
Small (3)
Floor Joist
Frames
Large (3)
1.
Lay out Large Floor Joist Frame and 2 Floor Joists as
illustrated above. Position Joists equally in Floor Joist Frame.
Use Small Floor Joist Frame as a template to determine
joist position. Position Joist so flush with framing.
Parts (Steps 1 - 6)
Floor Joists
(1 1/2" x 3 1/2" x 71 7/8") x 6
Floor Joist Frames - Large
(45 1/2" x 75") x 3
Floor Joist Frames - Small
(45 1/2" x 21") x 3
Toll Free 1-888-658-1658
Plywood Floor
Large (3)
Concrete Pad
(optional foundation method)
Hardware (Steps 1 - 6)
S1 - 2 1/2" Screws
www.outdoorlivingtoday.com
Exploded view of all parts necessary to complete
Floor Section. Identify all parts prior to starting.
Note: Floor Footprint is 136 1/2" wide x 96" deep.
Flush
with
framing
x 58 total
Page 7
Floor Runners (8)
Floor Runners (2)
You
can
find
Square Drive Bit for
the screws in with
the Hardware Kit Bag.
sales@outdoorlivingtoday.com
the

Advertisement

loading

This manual is also suitable for:

Cabana 12x8