Download Print this page

Floor Section - OLT Muskoka Cabin 9x9 Assembly Manual

Advertisement

1. Floor Section

Part 40 (3pcs)
1.
Lay out Part 36 - Floor Frame and two Part 38 - Floor Joists as illustrated above. Position
Joists so they are spaced equally in Floor Frame and flush with framing. When correctly positioned,
attach each Joist with 4 - 2 1/2" Screws (2 per end). You can find the Square Drive Screw Bit in
the Hardware Kit Bag. Complete remaining Floor Frame the same.
Toll Free 1-888-658-1658
Part 38 (6pcs)
Part 36 (3pcs)
www.outdoorlivingtoday.com
Exploded view of all parts necessary to complete
Floor Section. Identify all parts prior to starting.
Note: Floor Footprint is 110 1/4" wide x 110 1/4" deep.
Page 7
Part 39 (3pcs)
Part 37 (6pcs)
Part 35 (3pcs)
sales@outdoorlivingtoday.com

Advertisement

loading