1. Floor Section
Floor Frames - 2pcs.
(Part 1A)
Center Floor
Joists - 4pcs.
(Part 1B)
15"
15"
1.
Lay out 1A - Floor Frame and two 1B - Floor Joists as illustrated
above. Position the center of each Joist 15" from the outer edge of Floor
Frame. When correctly positioned, attach each Joist with
4 - 2 1/2" Screws (2 per end). You can find the Square Drive Screw
Bit in the Hardware Kit Bag. Complete remaining Floor Frame the
same.
2.
Lay out both complete floor joist frames as illustrated. The footprint for the
floor when attached together will be 141 1/2" wide x 45 1/2" deep. Attach
frames together with 6 - 2 1/2" Screws.
Toll Free 1-888-658-1658
Floor Runners - 7pcs.
(Part 1C)
Concrete Pad
(optional foundation method)
Flush with framing
top/bottom.
141 1/2"
www.outdoorlivingtoday.com
Exploded view of all parts necessary to complete
Floor Section. Identify all parts prior to starting.
Note: Floor Footprint is 141 1/2" wide x 45 1/2" deep.
Plywood Floor - 2pcs.
(Part 1D)
45 1/2"
Page 7
Parts
1A - Floor Joist Frames
(45 1/2" x 70 3/4") x 2
1B - Floor Joists
(1 1/2" x 3 1/2" x 67 3/4") x 4
Hardware
S1 - 2 1/2" Screws x 16 total
You can find BR1 - Square
Drive Bit for the screws in
with the Hardware Kit Bag.
Hardware
S1 - 2 1/2" Screws
x 6 total