Install The Cover Plates (Metal Foundation); Mechanical Installation Of The Charge Post; Install The Charge Post - General Procedure - ABB Terra HP Generation 3 Installation Manual

Ul 175 kw static dc system
Hide thumbs Also See for Terra HP Generation 3:
Table of Contents

Advertisement

Procedure
1. Install the cover plate (B) on the
foundation (A).
2. Install the fasteners (C).
3. Tighten the fasteners to the correct
torque. For the specification, refer to
section 12.14.
6.2.7

Install the cover plates (metal foundation)

Preliminary requirements
Procedure
1. Install the cover plates (A).
2. Install the fasteners (B) and (C).
Include washers
3. Tighten the fasteners to the correct
torque. For the specification, refer to
section 12.14.
6.3

Mechanical installation of the charge post

6.3.1

Install the charge post - general procedure

Preliminary requirements
9AKK107992A3069-EN | 004
1.
The cabinet is installed on
the foundation.
1.
The charge post is above the foundation.
Installation
A
48 fasteners M6 (included
in the foundation kit)
Four fasteners M12
(included in the foundation
kit)
B
A
C
A
C
B
B
B
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra hp generation 3 ulTerra hp 3

Table of Contents