ABB Terra HP Generation 3 Installation Manual page 37

Ul 175 kw static dc system
Hide thumbs Also See for Terra HP Generation 3:
Table of Contents

Advertisement

Procedure
1. Install the swivel eye bolts or bolts
with lifting loops (A).
2. Connect the cables (B) of the hoisting
equipment to the swivel eye bolts or
bolts with lifting loops.
3. Move the cabinet to the correct
location.
4. Remove the swivel eye bolts or bolts
with lifting loops (A).
5. Install the plastic cover on the
threaded location.
9AKK107992A3069-EN | 004
Caution:
Do not drop the cabinet.
Make sure that there are no dynamic forces on the hoisting points.
Make sure that the weight is equally distributed between the hoisting
points.
Inspection and transport
B
A
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra hp generation 3 ulTerra hp 3

Table of Contents