ABB Terra HP Generation 3 Installation Manual page 56

Ul 175 kw static dc system
Hide thumbs Also See for Terra HP Generation 3:
Table of Contents

Advertisement

Electrical installation of the charge post
Procedure
1. Guide the cable (A) to the switch
ethernet device (B).
2. Connect the RJ45 plug to the switch
port X1 (C).
56
C
B
9AKK107992A3069-EN | 004
A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra hp generation 3 ulTerra hp 3

Table of Contents