Chrono Scheduling Of The Heat Pump - Nibe Drazice Aqua HP 250 Operating And Installation Manual

Table of Contents

Advertisement

5.5.6 Chrono scheduling of the heat pump

The heat pump has an internal clock that allows the user to set two periods of operation for the control of
the equipment. These periods can be distinctly defined as weekly (Monday to Friday) or weekend (Saturday
and Sunday).
Once the periods of operation have been programmed, the user must then activate them, for example:
Note: The programming is set for a 24-hour period, considering first of all the lowest hour in the table,
for example:
In short, the following procedures should be carried out to define the operating hours:
1° – Enter the menu and access the parameter "Chrono Heat Pump"
2° – Select, for example, a weekly schedule (Monday to Friday)
3° – Set the operating time for each period
4° – Activate or disactivate.
- 26 -

Advertisement

Table of Contents
loading

Table of Contents