Nibe BA-ST 9022 - FE Installation & Operating Manual

Nibe BA-ST 9022 - FE Installation & Operating Manual

Hot water storage tank

Advertisement

Quick Links

Installation & Operating Manual
BA-ST 9022 - FE
BA-ST 9030 - FE
BA-ST 9040 - FE
BA-ST 9050 - FE
BA-ST 9075 - FE
BA-ST 9100 - FE
Hot Water Storage Tank
17.01.2020
25619

Advertisement

Table of Contents
loading

Summary of Contents for Nibe BA-ST 9022 - FE

  • Page 1 Installation & Operating Manual BA-ST 9022 - FE BA-ST 9030 - FE BA-ST 9040 - FE BA-ST 9050 - FE BA-ST 9075 - FE BA-ST 9100 - FE Hot Water Storage Tank 17.01.2020 25619...
  • Page 2 Operation of the product by children is strictly prohibited. We reserve the right to make the product design changes and changes in the manual. ©NIBE-BIAWAR 2019...
  • Page 3: Table Of Contents

    List of contents 1 General 5 Maintenance ______________________ _________________ Introduction _____________________ 4 Inspection of the Protective Intended Use ____________________ 4 Magnesium Anode ______________ 11 Contact ________________________ 4 Measurement of the Protective Magnesium Anode Wear __________ 11 Replacement of the Protective 2 Design ________________________ Magnesium Anode ______________ 12...
  • Page 4: General

    1 General Introduction Contact Thank you for your trust and selection of a NIBE If you have any questions or doubts, please contact device. To fully take advantage of this device, you should read this manual before using the equipment, in particular chapters relating to installation, safety, NIBE-BIAWAR sp.
  • Page 5: Design

    2 Design Storage tank is made of high quality steel. Storage tank is allowed to work in water installations with a Vertical storage tanks with of BA-ST Series are pres- maximum pressure of 10 bar (BA-ST 9022-FE up to 6 sure equipment, i.e.
  • Page 6 XL54 XL35 Fig. 4 Section of the BA-ST 9075-9100-FE storage Fig. 5 Side view of the BA-ST 9075-9100-FE storage tanks. tanks. Hot water intake connector pipe Protective magnesium anode Hot water inlet connector pipe Adjustable foot Hot water circulation connector pipe XL54 Thermometer UL1-3 Temperature sensor cover...
  • Page 7: Installation

    (that should be installed in accordance with the anode manufacturer’s instructions) or the ap- propriate magnesium chain anode. For the specifi ca- tion of the protective anodes available at NIBE, see Section 6 “Accessories and Spare Parts”. Fig. 7 Levelling the unit.
  • Page 8: Installation Requirements

    Fig. 8 Housing and thermal insulation disassembly. INFORMATION In order to minimize the fl ow of water from the safety valve associated with the thermal ex- Installation Requirements pansion of the liquid, it is advisable to install a suitable expansion vessel at the cold water CAUTION connection (see Fig.
  • Page 9 BA-ST xx-FE storage tank. QM30 BA-ST xx-1FE N storage tank. c.w.u. QM30 Cut-off valve-Hot water outfl ow QM33 QM31 Cut-off valve-supply from the heat source hot water QM32 Cut-off valve-return to the heat source circulation QM33 GP11 QM33 Cut-off valve-hot water circulation QM35 Cut-off valve-Cold water intake QM42 Cut-off valve-loading the storage tank Safety valve.
  • Page 10: Connection And Start-Up

    4 Connection and start-up CAUTION Open the hot water intake valves before Connection heating the system up for the first time or af- ter a longer break in its operation in order to CAUTION check whether the storage tank is filled with water and the cut-off valve at the cold water The storage tank connections may not be inlet is not closed.
  • Page 11: Maintenance

    ture above 70 °C. This also eliminates the risk of INFORMATION Legionella bacteria growth. The use of the isolated anode allows you to mon- • In the systems with the electric heating unit, en- itor the degree of wear of the anode by measur- sure that the electrical installation is properly pro- ing the intensity of the protecting direct current without having to remove it and empty the tank...
  • Page 12: Replacement Of The Protective Magnesium Anode

    CAUTION Ensure that the anode protective conductor 0,3 mA is connected to the storage tank top head after installing the new isolated magnesium anode. Lack of connection of the anode with the tank will completely block the work of the anode and the tank will be deprived of corro- sion protection.
  • Page 13: Accessories And Spare Parts

    Table 2. Heating units. fl anged cover and fl ush the storage tank and re- move accumulated sludge and lime slurry. Pay Connec- Storage tank Heating special attention to not damage the ceramic Type tor pipe model unit power enamel coating. 7.
  • Page 14: Service

    Storage tank Inspection Type of model opening dia. gasket According to the NIBE-BIAWAR rules, the products have been manufactured of high quality materials us- BA-ST 9022-FE Flanged ing the latest technologies and solutions that do not BA-ST 9030-FE ø 120 gasket endanger the environment.
  • Page 15: Technical Data

    9. Technical data Table 6. Technical data Storage tank model Parameter BA-ST BA-ST BA-ST BA-ST BA-ST BA-ST 9022-FE 9030-FE 9040-FE 9050-FE 9075-FE 9100-FE Energy effi ciency class Storage volume (V)* 222,3 293,1 384,7 488,8 742,0 983,7 Standing loss (S)* 79,2 88,8 92,5 102,9...
  • Page 16: Dimensions

    Dimensions XL54 XL35 Fig. 18 Dimensions of the BA-ST 750-9100-FE storage tanks. Chapter 9 | Technical data BA-ST 9022-9100-FE...
  • Page 17 Table 7. Connector pipe diameters Storage tank Connection BA-ST BA-ST BA-ST BA-ST BA-ST BA-ST 9022-FE 9030-FE 9040-FE 9050-FE 9075-FE 9100-FE Inspection opening ø120 ø180 XL35 Heating unit connection 1¼” Female 1 ½” Female 2” Female XL54 Thermometer enclosure ø10 Female Cold water supply ¾”...
  • Page 18 NOTES...

Table of Contents