1.1 Introducti on Thank you for your confi dence and choice of equipment by NIBE. To fully benefi t from the advantages of this product, ple- ase read this Manual before using it, and in parti cular chap- ters relati ng to the applicati on, installati on and maintenance, and warranty.
INSTALLATION AND OPERATING MANUAL 2. DESIGN Verti cal storage tanks with two coils of BA-ST Series are Storage tank is made of high quality steel and is equipped pressure equipment, i.e. the pressure within the storage with two helical coils that can simultaneously operate with tanks and coils are equivalent to the pressures in the corre- two independent heat sources, e.g.
Page 5
INSTALLATION AND OPERATING MANUAL Fig. 4 Secti on of the BA-ST 9075-9100 - 2FE storage tanks. Fig. 5 Side view of the BA-ST 9075-9100 - 2FE storage tanks. Upper insulati on of the storage tank Thermometer Upper coil 10. Connector pipe for mounti ng electric heati ng unit Protecti ve magnesium anode 11.
For the specifi cati on of the protecti ve anodes available at NIBE, see Secti on 6 Accessories and Spare Parts. Fig. 7 Levelling the unit. The storage tank stands on three feet that can be adjusted within the range from 0 to 15 mm to level the tank.
Connect the storage tank to the water supply system of wa- ati ng system. ter pressure at least 1 bar and max 10 bar (BA-ST 9022 - 2FE up to 6 bar) and to the heati ng systems where parameters of...
INSTALLATION AND OPERATING MANUAL supply from the upper coil 1. BA-ST storage tank 2. Cut-off valve hot water circulati on 3. Safety valve return from the upper coil 4. Drain valve supply of the lower coil 5. Pressure reducer (opti on, if the pressure in the system exceeds the allowable value) 6.
INSTALLATION AND OPERATING MANUAL Informati on • The isolated protecti ve anode earth conductor must be connected to the steel components of the storage tank (top bott om of the tank). Otherwise, the tank will not be The use of the isolated anode allows you to monitor the protected against corrosion.
INSTALLATION AND OPERATING MANUAL 5.3 Replacement of the Protecti ve Magnesium Anode 5.4 Cleaning of the Storage Tank Replace the protecti ve magnesium anode every 18 months Boiler scale is precipitated from the heated water during the (regardless the measurement). Instead of the magnesium storage tank operati on.
INSTALLATION AND OPERATING MANUAL 9.1 Dimensions Fig. 15 Dimensions of the BA-ST 9022/9050 - 2FE storage tanks Fig. 16 Dimensions of the BA-ST 9075/9100 - 2FE storage tanks Hot Water Storage Tank with Two Coils BA-ST 9022/9100 - 2FE...
Page 16
NIBE Energy Systems France Sarl, Zone industrielle RD 28, Rue du Pou du Ciel, 01600 Reyrieux Tel : 04 74 00 92 92 Fax : 04 74 00 42 00 E-mail: info@nibe.fr www.nibe.fr NIBE Energy Systems Ltd, 3C Broom Business Park, BridgeWay, Chesterfield S41 9QG Tel: 0845 095 1200 Fax: 0845 095 1201 E-mail: info@nibe.co.uk www.nibe.co.uk...