INTEGRA Metering CALEC ST III User Manual page 33

Standard & smart multi-protocol heating and cooling energy calculator
Table of Contents

Advertisement

Installation
Module #1: A11/B11 (Channel #1)
The service PIN and the Wink LED are available for identification on the LON network.
Disconnect the CALEC® ST III from the power
u
supply.
Take off the front cover [}p. 20].
u
If module #1 is installed: Connect LON to termi-
u
nals A11 (cyan) and B11 (purple).
If module #2 is installed: Connect LON to termi-
u
nals A21 (cyan) and B21 (purple).
Close the front cover [}p. 20].
u
Apply voltage.
u
KNX
Module #1: A11/B11 (Channel #1)
Possible daisy chain wiring: A12/B12
Disconnect the CALEC® ST III from the power
u
supply.
Take off the front cover [}p. 20].
u
If module #1 is installed: Connect KNX to termi-
u
nals A11 (red) and B11 (black).
OR
Connect KNX Daisy Chain to terminals A12 (red)
and B12 (black).
If module #2 is installed: Connect KNX to termi-
u
nals A21 (red) and B21 (black).
OR
Connect KNX Daisy Chain to terminals A22 (red)
and B22 (black).
Close the front cover [}p. 20].
u
Apply voltage.
u
LoRa
3-140-UM-EN-02
The service LED provides information about the system condition.
The interface is electrically isolated.
Max. current consumption: 10 mA
Material damage due to operation without antenna
Operation without an antenna can cause damage to the product.
Make sure, the antenna is connected before operation.
u
Module #2: A21/B21 (Channel #1)
Possibly non-poled
Module #2: A21/B21 (Channel #1)
Possible daisy chain wiring: A22/B22
Factory settings:
Baud rate: 9'600 Baud
NOTICE
33 / 56

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents