System Integration; Commissioning; Function Check; Switching On The Measuring Device - Endress+Hauser HART Flowmeter Proline 400 Brief Operating Instructions

Transmitter with electromagnetic sensor
Table of Contents

Advertisement

Flowmeter Proline 400
7

System integration

For detailed information on system integration, see the Operating Instructions for the
device →  3
• Overview of device description files:
• Current version data for the device
• Operating tools
• Measured variables via HART protocol
• Burst mode functionality in accordance with HART 7 Specification
8

Commissioning

8.1

Function check

Before commissioning the measuring device:
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist →  18
• "Post-connection check" checklist →  40
8.2

Switching on the measuring device

After a successful function check, switch on the measuring device.
 After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to the
Operating Instructions for the device →  3
8.3

Setting the operating language

Factory setting: English or ordered local language
Endress+Hauser
System integration
49

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HART Flowmeter Proline 400 and is the answer not in the manual?

This manual is also suitable for:

Proline 400Proline promag w 400

Table of Contents