Installing The Processing Racks; Installing The Dryer Rack - Kodak Prostar Operator's Manual

Archive processor 220-240 v
Table of Contents

Advertisement

Installing the processing
racks

Installing the dryer rack

A-62051 May 2008
1. Make sure that the rollers of each rack turn freely when you rotate
the drive gear.
2. Drain off any excess water if the racks were left submerged in water
since the last time film was processed.
3. Hold the gear cover back and lower the processing racks into the
processor (#6 rack first, then #5, #4, #3, #2, and #1).
The rack number is located just above the drive gear.
CAUTION: Lower the racks slowly and carefully into the
Archive Processor to avoid splashing any chemicals.
1. Lift off the dryer section cover.
2. Make sure that the rollers of the dryer rack turn freely when rotating
the drive gear.
3. Pull the gear cover back and lower the dryer rack into the dryer
section.
4. Replace the dryer section cover.
Rack #6
Gear Cover
Dryer Section Cover
Dryer Rack (#7)
Gear Cover
9

Advertisement

Table of Contents
loading

Table of Contents