Kodak Prostar Operator's Manual page 31

Archive processor 220-240 v
Table of Contents

Advertisement

A-62051 May 2008
4. Pull the gear cover back and lift the developer tank out of the
Archive Processor. The developer tank is labeled with a D.
5. Empty the developer tank.
6. Fill the developer tank with Kodak Prostar Plus Developer, or
equivalent, until the level reaches the fill line (approximately
½ gallon or 1.3 liters).
7. Wrap the overflow tubing closely around the right side of the
developer tank.
8. Hold the gear cover back and slowly and carefully lower the
developer tank into the first position in the Archive Processor.
NOTE: Make sure that the tank is fully seated and level with the fill
line toward the rear of the Archive Processor.
9. Route the tubing from the developer tank through the notch in the
partition.
10. Insert the tubing into the standpipe.
11. Empty the fixer tanks.
12. Fill the fixer tanks with Kodak Prostar Plus Fixer, or equivalent, until
the level reaches the fill line (approximately ¼ gallon or 0.65 liters
per tank).
13. Hold the gear cover back and slowly and carefully lower the fixer
tanks into the fourth and fifth position in the Archive Processor.
NOTE: Make sure the tanks are fully seated and level with the fill
line toward the rear of the Archive Processor.
14. Hold the gear cover back and lower the processing racks back into
the processor (#5 rack first, then #4, #3, #2, and #1).
The rack number is located just above the drive gear. Hold a
sponge under the racks when transferring them from the sink.
This avoids chemicals dripping on surrounding work areas or
the floor and possible cross-contamination of chemicals.
CAUTION: Lower the racks slowly and carefully into the
Archive Processor to avoid splashing any chemicals.
15. Close the processing section cover.
16. Power up the Archive Processor or turn the water on, depending on
the action that you performed in Step 1.
17. Allow approximately 25 minutes for the developer temperature to
stabilize before attempting to adjust the temperature control setting.
18. Press and release the Mode switch to the Run position.
19. Feed a self-threader into the feed chute on the #1 rack to make sure
that all racks are fully seated and working properly. Allow the self-
threader to exit the processor.
20. Lift and release the tension roller to shut off the processor. The
processor will stop 60 seconds after the tension roller is released.
27

Advertisement

Table of Contents
loading

Table of Contents