Maintenance; Before You Start; Safety During Maintenance; Checks Before Maintenance - Halton Safe Management 2.0 Installation, Commissioning, Operating, And Maintenance Manual

Table of Contents

Advertisement

Halton Safe Management 2.0 (SM2) - Installation, commissioning, operating, and maintenance guide

7 Maintenance

7.1 Before you start

7.1.1 Safety during maintenance

7.1.2 Checks before maintenance

Make sure you have the following:
▪ A list of the ID numbers and locations of the Halton Safe Management 2.0 system components
▪ Access to the Halton Safe Management 2.0 system components
▪ The BMS event/alarm log of the most recent maintenance period

7.2 Maintenance schedule

Carry out scheduled maintenance according to the maintenance plan of the building.
Note: To ensure proper operation of fire dampers, inspection must be carried out regularly according to local
building codes. The minimum recommended inspection period is every 6 months. Save the inspection
documentation for future needs.
Note: In normal conditions, the Halton Safe Management 2.0 controller does not require yearly maintenance.

7.3 Step by step instructions

7.3.1 Logging in as Service

For information on the user levels, see
1. On the homepage, select the lock icon at the top of the view. A keypad opens.
1.0
NOTICE
All installation, commissioning, and maintenance work must only be carried out by
qualified personnel.
User
levels.
All rights reserved ©Halton
NOTICE
50

Advertisement

Table of Contents
loading

Related Products for Halton Safe Management 2.0

This manual is also suitable for:

Sm2

Table of Contents