Halton Safe Management 2.0 (SM2) - Installation, commissioning, operating, and maintenance guide
40
5. View the test report. For instructions, see
Viewing a test
report.
5.4 Checks after commissioning
Make sure you have done the following:
▪ Document the test results and fill in the needed commissioning documents.
1.0
All rights reserved ©Halton