Connecting A Halton Safe Hsp Power Unit To The Main Power Supply; Connecting The System To The Main Power Supply; Checks After Installation - Halton Safe Management 2.0 Installation, Commissioning, Operating, And Maintenance Manual

Table of Contents

Advertisement

Halton Safe Management 2.0 (SM2) - Installation, commissioning, operating, and maintenance guide

4.2.11 Connecting a Halton Safe HSP power unit to the main power supply

Note: Do not connect a device that does not have its own fuse to the 24 V AC side of a Halton Safe HSP power
unit.
Connect the wires of the power supply cable to the connectors in the Halton Safe HSP unit.

4.2.12 Connecting the system to the main power supply

Note: Before connecting the system to power, you need to set the addresses of the Halton Safe HSL link units. For
instructions, see
Setting the address of a Halton Safe HSL link
Connect the power plug of the Halton Safe Management 2.0 controller to the socket.

4.3 Checks after installation

Before commissioning can start, make sure the following has been taken care of:
▪ All the components are installed correctly.
▪ All the cabling follows the local regulations and also the cabling requirements listed in
requirements.
▪ All the wiring is installed correctly.
▪ All the electrical installations have been inspected.
1.0
ELECTRIC SHOCK HAZARD
Before carrying out any electrical work, turn off the power to avoid injury from electrical
current.
NOTICE
All electrical work must only be carried out by qualified personnel.
As the power supply cable also serves as a power strip separator for the controller,
connect the power supply cable into an easily accessible and grounded socket only.
All rights reserved ©Halton
WARNING
NOTICE
unit.
CAUTION
19
Installation

Advertisement

Table of Contents
loading

Related Products for Halton Safe Management 2.0

This manual is also suitable for:

Sm2

Table of Contents