Halton Safe Management 2.0 (SM2) - Installation, commissioning, operating, and maintenance guide

5 Commissioning

5.1 Before you start

5.1.1 Safety during commissioning

5.1.2 Commissioning process

The commissioning is carried out by Halton Field Service or an approved partner.
The main steps in the commissioning process are the following:
▪ Verifying that the Halton Safe Management 2.0 controller and the related components have been installed
and connected correctly.
▪ Configuring the components of the system according to the design specifications.
▪ Setting up the schedule for automated testing.
▪ Testing the system.
▪ Filling in the commissioning documents.

5.1.3 Commissioning and maintenance information

The project-specific parameters of the controller are configured during system commissioning on site. Wiring needs
to be checked before the system start-up.
The Halton Safe Management 2.0 controller addressing is pre-set at the factory. If addressing needs to be changed
later or if any system parameters need to be modified, it can be done from the controller user interface.
Halton Safe HSL link unit addressing is defined during system commissioning. Each Halton Safe HSL link unit must
have a unique address. The addresses are defined by using the DIP switches in the Halton Safe HSL link units.

5.1.4 Checks before commissioning

Make sure you have the following:
▪ System schematic drawings
▪ A list of the parameters that need to be configured to the Halton Safe Management 2.0 controller
▪ The IDs and installation locations of the Halton Safe HSL link units
▪ The IP address of the Halton Safe Management 2.0 controller
▪ The BACnet/IP address of the Halton Safe Management 2.0 controller, if BACnet/IP is used
Also make sure that RJ45 Ethernet network cables with jacks have been installed and tested.
1.0
NOTICE
All installation, commissioning, and maintenance work must only be carried out by
qualified personnel.
All rights reserved ©Halton
NOTICE
20

Advertisement

Table of Contents
loading

Related Products for Halton Safe Management 2.0

This manual is also suitable for:

Sm2

Table of Contents