3 | Design Information
3.1.4 Regulations and standards for permitted fuels
3.2 Installation and approval
Note on standards
3.3 Installation site
8
1. BImSchV
EN ISO 17225-2
EN ISO 17225-3
EN ISO 17225-5
The boiler should be operated in a closed heating system. The following standards
govern the installation:
EN 12828 - Heating Systems in Buildings
IMPORTANT: Every heating system must be officially approved.
The appropriate supervisory authority (inspection agency) must always be informed when
installing or modifying a heating system, and authorisation must be obtained from the
building authorities:
Austria: report to the construction authorities of the community or magistrate
Germany: report new installations to an approved chimney sweep / the building
authorities.
Requirements for the load bearing substrate:
▪ Flat, clean and dry
▪ Non-combustible and with sufficient load-bearing capacity
Conditions at the installation site:
▪ Frost-free
▪ Sufficiently well lit
▪ Free of explosive atmospheres such as flammable substances, hydrogen halides,
cleaning agents and consumables
▪ Installation at altitude higher than 2000 metres above sea level only after consultation
with the manufacturer
▪ The system must be protected against gnawing and nesting by animals (such as
rodents)
▪ No flammable materials in proximity to the system
First Order of the German Federal Government for the
implementation of the Federal Law on Emission Protection
(Ordinance on Small and Medium Combustion Plants) in the version
published on 26 January 2010,
BGBl. JG 2010 Part I No. 4.
Solid bio-fuel - Fuel specifications and classes
Part 2: Wood pellets for use in industrial and domestic systems
Solid bio-fuel - Fuel specifications and classes
Part 3: Wood briquettes for non-industrial use
Solid bio-fuel - Fuel specifications and classes
Part 5: Firewood for non-industrial use
M1820921_en | Installation instructions Dual fuel boiler SP Dual compact
Need help?
Do you have a question about the SP Dual compact and is the answer not in the manual?