Connecting The Hose Lines - Fröling SP Dual compact Installation Instructions Manual

Dual fuel boiler
Hide thumbs Also See for SP Dual compact:
Table of Contents

Advertisement

6 | Installation

6.8.2 Connecting the hose lines

58
r Secure the cover hood with the previously removed screws
Once the discharge system has been assembled in accordance with the assembly
instructions enclosed, the suction and return air line need to be connected to the pellet
unit
On the back of the pellet unit:
r Run the return air line (A) to the left connection
r Run the suction hose (B) to the right connection
NOTICE! Ensure the potential equalisation matches the discharge system
assembly instructions when connecting the hose lines!
M1820921_en | Installation instructions Dual fuel boiler SP Dual compact

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SP Dual compact and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Sp dual compact 15Sp dual compact 20

Table of Contents