Gold's Gym XR 45 User Manual page 12

Hide thumbs Also See for XR 45:
Table of Contents

Advertisement

8. Attach the Upper Shroud (17) to the Top Frame
(4) with two M6 x 16mm Self-tapping Screws
(49) and two M6 Washers (82). Do not tighten
the Screws yet.
Attach the Lower Shroud (90) to the brackets on
the Stabilizer (2) with two M6 x 16mm Self-tap-
ping Screws (49) and two M6 Washers (82).
Make sure that the brackets are inside the
Lower Shroud. Tighten the four Screws used
in this step.
See steps 2 and 4. Tighten the M10 Locknuts
(56) and the M8 Locknuts (58).
See step 3. Tighten the M8 x 20mm Screws
(96).
See step 6. Tighten the M8 Locknuts (58) and
the M10 x 25mm Bolts (74).
See step 7. Tighten the M5 x 20mm Self-tap-
ping Screws (64), the M6 x 16mm Screws (62),
and the M6 Locknuts (78).
Arm Assembly
9. Apply grease to the barrel of an M10 x 64mm
Bolt Set (76).
Orient the Leg Lever (8) so that the welded sup-
port is on the side shown.
Attach the Leg Lever (8) to the Front Leg (7)
with the M10 x 64mm Bolt Set (76). Make sure
that the barrel of the Bolt Set is inserted
through both sides of the bracket on the
Front Leg.
8
82
49
49
82
9
76
Grease
8
Welded
Support
12
4
17
90
2
Bracket
82
49
7
76

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ggsy2067.3

Table of Contents