2.3
Inspection
2.4
Power supply
iCON grade iCP42, Commissioning
Step
Description
3.
Orientate the SIM card as illustrated.
4.
Insert the SIM card into the card slot and push it in until it locks in place.
5.
Insert the USB-Stick into the USB slot and push it in until it locks in place.

Inspection Prior to Commissioning

1. Check that the cradle on/off switch is put into off position.
2. Check that the iCP42 is readily snapped into the cradle.
3. Check that the cradle LEDs are operating normally.
• The top led should blink to show that messages are being transmitted from the CAN
bus over the IR link.
• The middle LED should blink to show that messages are being received from the CAN
bus over the IR link.
• The bottom LED should remain on to show that the cradle has sufficient power.

Commissioning

The iCP42 is powered in the following way:
• Induction based power through the backside of the iCP42 facing the cradle.