Procom FBNSD400T-ZC Series Owner's Operation And Installation Manual page 13

Vent-free gas system
Table of Contents

Advertisement

1. Frame in rough opening. Use dimensions
shown in Figure 7 for the rough opening.
If installing in a corner, use dimensions
shown in Figure 9, for the rough opening.
The height is 23
the wall opening above.
2. Locate standoff brackets in the hardware
bag. Remove screws from the top of the
firebox. Install brackets with screws as
shown in Figure 10.
3. Carefully set fireplace in front of rough
opening with back of fireplace inside wall
opening.
4. Attach gas line to fireplace gas regulator.
See Connecting to Gas Supply, page 14.
5. Check all gas connections for leaks. See
Checking Gas Connections, page 16.
3/4" Clearance to Facia
3/4" Clearance to Sides, Back and Top
Note: Height of fireplace opening on facia to be 29"
Figure 6 - Clearance to Combustibles
Wall
Mantel
Surface
Shelf
10"
8"
6"
4"
2"
2
/
1
Bottom Edge
of Vent Hood
Fireplace
Note: All vertical measurements
are from lower edge of vent
hood to bottom of mantel shelf.
Figure 7 - Fireplace Clearances
200348-01C
INSTALLATION
/
", which is the same as
1
4
27
/
"
5
8
28
/
"
7
8
Safe
Zone
1.0 Slope
Factor
18"
16"
14"
12"
10"
"
2
www.usaprocom.com
IMPORTANT: When finishing your firebox,
combustible materials such as wall board,
gypsum board, sheet rock, drywall, plywood,
etc, must have 1/2" clearance to the sides
and top of the firebox. Combustible materials
should never overlap the firebox front.
Figure 8 - Rough Opening for Wall
Figure 9 - Rough Opening for Corner
42" to
Ceiling
Figure 10 - Installing Standoff Brackets
Installation
27
/
"
5
8
53
/
"
3
8
Installation
Screws
Standoff Bracket
26
/
"
7
8
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents