Fancom 750 User Manual page 13

Table of Contents

Advertisement

Lumina 750
2.5.6
PHASE 8: Cool down spawning
Aim
To quickly decrease the compost temperature to the required value so that spawn can be
applied. This phase can be ended by selecting the next phase manually.
Uses
Method
Cools the air inlet and compost temperature using the air inlet, sometimes using cooling.
Cooling down should be carried out as quickly as possible. The time needed depends on the air
conditioning unit capacity and the outside temperature conditions.
2.5.7
PHASE 9 - 12: Spawn run 1 - 3 / Delivery
Aim
To maintain the compost temperature at a required temperature for optimal spawn (mycelium)
development. The grower decides when to stop this phase. As the compost temperature is the
most important factor in this phase, this should also influence the ideal air inlet temperature.
The grower decides when the tunnel should be ready for delivery, by setting his parameters for
the delivery phase. If needed he will decide for a compost temperature decrease to maintain
temperature during transportation.
Uses
Method
Maintains the air inlet temperature at the correct value using fresh air or cooling. The compost
temperature determines the correct air inlet temperature value.
Temperature °C (°F)
28 (82)
26 (78)
24 (75)
22 (71)
20 (68)
18 (64)
Figure 5: Spawn run 1
use a large control range for the air inlet temperature
use the fan control optimally
fresh air to cool
the fan to minimize temperature differences
fresh air to cool
fan to minimize temperature differences
cooling
humidifying
Control range air
temperature
Measured compost temperature
Required compost temp.
Max. air temperature
Required air temp.
Min. air temperature
Basic working principles
Time
10

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 750 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Lumina 750Lumina 750 touch

Table of Contents