Section 5. Jlg Control System; Hand Held Analyzer - JLG 3394RT Service Maintenance Manual

Table of Contents

Advertisement

5.1

HAND HELD ANALYZER

Analyzer Display
Escape Key
To return home or access
previous menu
Up & Down Arrow Keys
Value Selector
To Connect the Hand Held Analyzer:
1. Connect the four pin end of the cable supplied with
the analyzer, to the four position connector on the
Analyzer Connection
3121133

SECTION 5. JLG CONTROL SYSTEM

menu:
HELP:
Figure 5-1. Hand Held Analyzer
Ground Control
Figure 5-2. Analyzer Connection
SECTION 5 - JLG CONTROL SYSTEM
PRESS ENTER
PCB in the ground control station or at the platform
control station as shown in. Connect the remaining
end of the cable to the analyzer.
Platform Controll
Analyzer Connection
– JLG Lift –
Enter Key
Stores and selects Top Level, Sub
Level, and item menus
Left & Right Arrow Keys
Used to move between Top Level,
Sub Level, and item menus
5-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

4394rt

Table of Contents