JLG 3394RT Service Maintenance Manual page 52

Table of Contents

Advertisement

SECTION 3 - CHASSIS & SCISSOR ARMS
13. Assembly of planet gear (Main Stage):
a. Mount the planet gears with Bearing Assembly
(1, 10), heated to approximately 189.5°F/70°C,
onto the planet bolts of the Spindle (34) and
secure the gears with new Snap Rings (13).
14. Install the Ring Gear (22).
15. Install the ring gear hex head bolts. Tighten bolts to
proper torque of 15.5 ft-lbs (21 Nm).
3-16
16. Install completely pre-assembled 1
into the gear drive.
17. Install Sun Gear Shaft (25).
18. Check axial clearance:
a. Determine clearance between contact face of
Sun Gear (3) and Sun Gear Shaft (25). (Recom-
mended clearance 1.0 -1.5mm)
– JLG Sizzor –
st
planet stage
3121133

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4394rt

Table of Contents