Preparing for the Installation
Use plenum-rated cable when it is necessary for safety and fire rating requirements. Consult your
local building codes to determine when it is appropriate to use plenum-rated cable, or refer to IEC
standard 850.
Keep all ports and connectors free of dust.
Figure 5: Properly Installed and Bundled Cable
1 = Ensure adequate slack and bend radius
Handling Fiber Optic Cable
Fiber optic cable must be handled carefully during installation.
Every cable has a minimum bend radius, example, and fibers will be damaged if the cables are bent too
sharply. It is also important not to stretch the cable during installation. Extreme Networks recommends
ExtremeSwitching SLX 9250 Hardware Installation Guide
Installing Cable
27

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ExtremeSwitching SLX 9250 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents