GE
DRAFT
DIRECTION 5775469, R
Chapter 3
Setup Instructions
Section 3-1
Overview
3-1-1
The Purpose of Chapter 3
This chapter contains information needed to setup the Voluson™ P8/Voluson™P6. Included are
procedures to receive, unpack and configure the equipment.
A worksheet is provided (see:
is available, prior to setup the system.
Table 3-1
Section
3-1
3-2
3-3
3-4
3-5
3-6
3-7
3-8
3-9
3-10
3-11
3-12
3-13
3-14
3
DRAFT (J
EVISION
page 3-90
Contents in Chapter Voluson™ P8/Voluson™P6
Overview
Set Up Reminders
Receiving and Unpacking the Equipment
Preparing for Set Up
Connection of Auxiliary Devices
Completing the Set Up
Printer Installation
System Configuration
Available Probes
Software/Option Configuration
Connectivity Setup
Network Configuration
Connectivity Setup Worksheet
Paperwork
Chapter 3 - Setup Instructions
19, 2018)
ULY
to
page
3-91) to help ensure that all the required information
Description
V
™ P8/V
OLUSON
OLUSON
B
S
M
ASIC
ERVICE
ANUAL
Page Number
3-1
3-2
3-5
3-9
3-11
3-24
3-31
3-55
3-67
3-67
3-68
3-71
3-90
3-92
™P6
3-1