After Operation; After Operation Safety; Hauling The Machine - Toro Workman GTX Operator's Manual

Electric utility vehicle
Hide thumbs Also See for Workman GTX:
Table of Contents

Advertisement

After Operation

After Operation Safety

General Safety
Before you leave the operating position, do the
following:
– Park the machine on a level surface.
– Move the direction selector to the N
position.
– Engage the parking brake.
– Shut off the machine and remove the key.
– Wait for all movement to stop.
Allow the machine to cool before adjusting,
servicing, cleaning, or storing it.
Do not store the machine where there is an open
flame, spark, or pilot light, such as on a water
heater or other appliance.
Keep all parts of the machine in good working
condition and all hardware tightened.
Maintain and clean the seat belt(s) as necessary.
Replace all worn, damaged, or missing decals.

Hauling the Machine

Use care when loading or unloading the machine
into a trailer or a truck.
Use full-width ramps for loading the machine into
a trailer or a truck.
Tie the machine down securely.
Refer to
Figure 21
and
locations on the machine.
Note:
Load the machine on the trailer with the front
of the machine facing forward. If that is not possible,
secure the machine hood to the frame with a strap,
or remove the hood and transport and secure it
separately or the hood may blow off during transport.
CAUTION
Loose seats may fall off the machine and
trailer when transporting the machine, and
the seats may land on another machine or
obstruct the roadway.
Remove the seats or ensure that the seats are
secured by the pivot pins.
EUTRAL
Figure 22
for the tie-down
1. Towing tongue and tie-down point (front of the machine)
1. Rear tie-down points
24
Figure 21
Figure 22
g236535
g034273

Advertisement

Table of Contents
loading

This manual is also suitable for:

0704307131tc07153

Table of Contents